top of page
Driscoll Student Center
University of Denver
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() |
The renovation of the existing student center building created a focal point for the University of Denver, and physically linked the two halves of the previously divided campus, by creating a bridge structure to an expansion building across Evans Avenue.
The Driscoll University Center houses a variety of functions, and was planned in phases to allow the building to maintain continuous operations during the 24-month construction period.
bottom of page